| |
MDEQ Letter (January 3, 2013)________________________________________________________________________________________
_________________________________________________________________________________________
MDEQ PERMIT APPLICATION COUNTY ROAD 595 - ADDITIONAL INFORMATION (January 17, 2012)
- Cover Letter
- Agent Letter
- Permit Application Form
- Application Section 1 & 3 : Project Location and Description
- Application Section 4: CR 595 Project Purpose, Use and Alternatives
595 Project Overview AAPA Section 4.0 Alternatives Evaluated for the Proposed Project AAPA Section 8.0 Wetland Mitigation AAPA Section 9.0 Stream Mitigation
- Application Section 10A, 10B & 12:
Wetland Cross Section SummaryWetland Cross Section Summary Wetland Impacts
-
Application Section 10C & 14: Wetland Equalization Culverts
-
Application Section 10C & 14 : Stream Crossing Schedule
-
Application Section 13: Floodplain Activities
-
Site Location Maps
-
Plan, Profile and Detail Sheets
-
Wetland Cross Sections
-
Stream Crossings
-
Bridges
-
Wetland Equalization Culvert Cross Sections
-
Upland - Wetland Drainage Culvert Cross Sections
-
Floodplain Activities
-
Wetland Mitigation Plans
-
Trail 5 Relocation Plans
-
Proposed County Road 595 - Alternatives Analysis and Project Assessment (AAPA) AAPA Revised (December 21, 2011) AAPA Table of Contents Appendix A: Marquette County Board Letter (October 4, 2010) MCRC Resolution MCRC Minutes: October 7, 2010; October 18, 2010; September 19, 2011 Appendix B: County Road 595 Corridor Maps Berquist Email (October 20, 2010 and October 28, 2010) MDOT Email (September 27, 2011) Berquist Email (October 28, 2011 and October 19, 2011) FHWA Functional Classification Guidelines MCRC Letter to MDOT (October 28, 2010) MDOT Annual Road Mileage Certification for Counties MDOT Letter (January 11, 2011) MDOT Letter (November 18, 2010) MDOT Support Letter (June 2, 2011) Memo to MCRC Recommending 595 (October 19, 2010) Request to Revise NFC Part 1 Request to Revise NFC Part 2 (October 28, 2010) Request to Revise NFC Part 2 Appendix C: Typical Cross Sections for County Road 595 Appendix D: County Road 595 Reply Section 1 County Road 595 Reply Section 2 County Road 595 Reply Section 3 Sign In Info for County Road 595 Meetings Appendix E: Red Road (South) Routes Evaluation Appendix F: Red Road Evaluation (DNRE Letter) Appendix G: Michigan State Police Letter of Support (July 2011) Appendix H: Stream Mitigation Plans EB/Salmon Trout Appendix I: Casperson Support Letter to Levin EPA Objection Letter from Sue Hedman Levin Address to Senate Appendix J: MCRC Permits/Dam Repair Appendix K: 2003 Flood Newspaper Articles re: 2003 Flood Photographs of 2003 Flood Damage Appendix L: Assessment of Proposed Stream Crossings Appendix M: 2008 Final Ecological Survey Report County Road 595 MiRAM Report Kipple Creek MiRAM RSH-Merlin Survey 2011 Addendum Second River P51 Addendum Wood Turtle Survey 2011 Addendum Appendix N: 2010 Breeding Bird Survey - Other Rites 2010 Draft Frog & Turtle Survey - Other Rites AECOM Preliminary Plans MiRAM - Other Rites Rare Plant Survey - Draft Stream P51 Assessments 2010 Appendix O: 595 Mulplains Ownership Map Nature Conservancy Easement - Mulligan Plains
-
AAPA Revised Final (January 9, 2012)
-
AAPA Table of Contents (January 9, 2012)
-
Wetland Delineation Report
- Hydraulic Reports
Triple A - E Branch Salmon Trout 595 Second River Dead River Escanaba River Mulligan Creek Trail 5 - Mulligan Yelllowdog
________________________________________________________________________________________
MDEQ PERMIT APPLICATION COUNTY ROAD 595 - MARQUETTE COUNTY ROAD COMMISSION (October 6, 2011)
-
___________________________________________________________________________________
AAPA COMPARISON*
Table of Contents
AAPA Comparison
*Please be advised the attached document represents our best effort to show the changes made to (differences between) the August 15, 2011 MDRC AAPA "draft for public review" as compared to the non-draft final version submitted to the DEQ on October 7, 2011 as part of the MCRC Parts 31/301/303 permit application. Due to the fact this document was produced electronically and is based upon our understanding and use of the Microsoft Word "Compare" feature, we cannot offer assurances that this document completely represents all of the changes made, or differences between the two documents it attempts to compare. The reader is advised to carefully read the current document(s) submitted with the DEQ permit application on October 7, 2011 to have an accurate and complete understanding of the DEQ permit application document(s) as submitted by MCRC.
_____________________________________________________________________________________
MAPS Proposed County Road 595 (October 2011)
Updated Comparison/County Road 595 (October 2011)
Proposed County Road 595 - Original (September 2011)
Kipple Creek vs. Wolf Lake Road (September 2011)
Kipple Creek vs. Wolf Lake Road Wetlands (September 2011)
|